Products - Tele-communications Platforms
 

MP-RB18-LA
MP-RB18 Standard
PPH Platform System

Installation Procedure

  • Lay out walk pads
  • Put bases on walk pads
  • Insert pre-assembled structures into base.
  • Attach grating to substructures.
  • Attach intermediate and top handrails, if provided.