| |
|
|
Products - Equipment Screens
 |
|
|
|
|
|
Equipment Screens |
Installation Procedure |
 |
- Scrape off loose gravel, if gravel exists.
- Consult manufacturer of existing or new roofing system
as to type of walk pads required for their roofing system.
- Determine spacing of supports
- Fully adhere walk pads by hot-mopping them to roof
system if required
- After pads are installed, place bases on pads
- Place pre-assembled equipment supports and stand-alone
supports into bases and adjust as needed.
- Fasten furring channels between adjacent rooftop
supports.
- Fasten siding/cladding to furring channels.
|
 |
|
|
|
 |
|
  |
|
|