| |
|
|
|
Projects - Pipe Support Systems
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Round base support system-RB18 with Roller,Pipe Guide and Walkpad. |
|
| University of Western Ontario, CPS Upgrade, Phase 2 | | | Rooftop FRP(fiberglass) 14"NPS Chilled Water Lines-Spring, 2007 |
|
| University of Western Ontario,CPS Upgrade, Phase 2 | | | Rooftop FRP(fiberglass) 14"NPS Chilled Water Lines-Spring, 2007. |
|
| University of Western Ontario-CPS Upgrade,Phase 2 | | | Rooftop FRP(fiberglass) 14"NPS Chilled Water Lines-Spring, 2007 |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Part No. PP10 with Roller, Pipe Guide and Walkpad. |
|
| St.JOseph Catholic High School-Barrie,Ont. | | | Part No. PP10 with Roller, Pipe Guide and Walkpad. |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Part NO. PP10 with Roller, Pipe Guide and Walkpad. |
|
| Cold Storage Faiclity. | | | Roftop Refrigeration Lines.-March, 2010. |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Round base support system-RB18 with Roller,Pipe Guide and Walkpad. |
|
| J.G.Workman Public School-Toronto District School Board | | | Rooftop Gas Line Supports with Super Sleeper with Roller, Pipe Guide and Rooftop Walkpad-P/N: SS-8R. |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Round base support system - RB18 with Roller,Pipe Guide and Walkpad. |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Round base support system-RB18 with Roller, PIpe Guide and Walkpad. |
|
| St.Joseph Catrholic High School-Barrie,Ont. | | | Round Base Support system-RB18 with Roller, PIpe Guide and Walkpad. |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Round base support system-RB18 with Roller, PIpe Guide and Walkpad. |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Round base support system -RB18 with Roller, Pipe Guide and Walkpad |
|
| PP10 w/ Roller and Pipe Guide and Conduit Support | | | PP10 w/ Roller and Pipe Guide and Conduit Support - Expanded Application |
|
| SWHA, Cambridge | | | Zero Penetration, Fully Height Adjustable |
|
| St.Joseph Catholic High School-Barrie,Ont. | | | Part No. PP10 with Roller,Pipe Guide and Walkpad. |
|
| Humber College-Etobicoke,Ont.-Chiller Upgrade. | | | Rooftop 6" NPS with 2 1/2" Thk. Insulation Chillede Water Lines located at 54" - Bottom of PIpe Elevation. |
|
| Cold Storage Facility. | | | Rooftop Refrigeration lines.-March 2010. |
|
| Cold Storage Facility | | | Rooftop refrigeration lines.-March 2010. |
|
| Sunnybrook Hospital-C-Wing. | | | Rooftop Multi-Line pipe supports-P/N: PSE-Custom. |
|
| Sunnybrook-C-Wing | | | Rooftop Multi-Line Pipe supports-P/N:PSE-Custom |
|
| Sunnybrook Hospital-C-Wing. | | | Rooftop Multi-Line pipe supports-P/N: PSE-Custom |
|
| Sunnybrook Hospital-C-Wing. | | | Rooftop multi-line pipe supports-P/N: PSE-Custom |
|
| University of Western Ontario, CPS Upgrade, Phase 2 | | | Rooftop FRP(fiberglass) 14"NPS Chilled Water Lines-Spring, 2007 |
|
| Humber College-Etobicoke,Ont.-Chiller Upgrade. | | | Rooftop 6" NPSD with 2 1/2" Thk. Insulation Chilled Water Lines located at 54" - Bottom of PIpe Elevation. |
|
| J.G.Workman Public School-Toronto District School Board | | | Rooftop Gas Lines supports with Super Sleeper with Roller, Pipe Guide and Rooftop Walkpad-P/N: SS-8R |
|
| Humber College-Etobicoke,Ont.-Chiller Upgrade. | | | Rooftop 6"NPS with 2 1/2" Thk. Insulation Chilled Water LInes located at 54" -Bottom of PIpe Elevation. |
|
| Humber College,Etobicoke,Ont.-Chiller Upgrade. | | | Rooftop 6"NPS with 2 1/2 " Thk. Insulation Chilled water lines at 54" -Bottom of Pipe Elevation. |
|
| HVAC Upgrade @ Robert Service P.S.-TDSB | | | Rooftop gas line supports w/zero roof penertation-with P/N: SS-8C |
|
| HVAC Upgrade @ Robert Service P.S.-TDSB. | | | Rooftop gas line supports w/zero roof penetration with P/N: SS-8C |
|
| HVAC Upgrade @ Robert Service P.S.-TDSB | | | Rooftop Gas Line supports w/zero roof penetration with P/N: SS-8C |
|
| HVAC Upgrade @ Robert Service Public School-TDSB | | | Rooftop Gas Line supports w/zero roof penetration. |
|
| J.G.Workman Public School-Toronto District School Board | | | Rooftop Gas Lines supports with Super Sleeper with Roller, Pipe Guide and Rooftop Walkpad-P/N: SS-8R. |
|
| J.G.Workman Public School-Toronto District School Board | | | Rooftop Gas Lines supports with Super Sleeper with Roller,Pipe Guide and Rooftop Walkpad-P/N: SS-8R |
|
| Sunnybrook Hospital-C-Wing | | | Rooftop multi-line pipe supports-P/N: PSE-Custom. |
|
| - | | | PP10 with Roller for Rooftop Gas Lines |
|
| SWHA | | | Rooftop PP10 gas line supports with Roller |
|
| PSE- Custom Application | | | Chilled Water Lines - Stacked Arrangement |
|
| Pipe Supports - Custom Application | | | - |
|
|
|
  |
|
|